Phone:+359 (0) 52/681-510
Fax:   +359 (0) 52/602-864
skip to the main content area of this page

BULGARIAN REGISTER OF SHIPPING


APPLICATION FOR CLASSIFICATION
according to Classification and Construction Rules
We herewith apply for Classification by Bulgarian Register of Shipping

SHIPYARD:
HULL NO./ PROJECT NO:
ADDRESS:
OWNER/ORDERER:
ADDRESS:

CHARACTERS OF CLASS APPLIED FOR:
HULL:
MACHINERY:
CARGO REFR. INSTALL.:
 
TIME SCHEDULE:
KEEL LAYING:
STARTING OF CONSTRUCTION
LAUNCHING:
COMPLETION:


The applicant accepts the following terms:

• The Classification and Construction Rules of Bulgarian Register of Shipping as valid on the date of conclusion of the building contract between shipyard and owners will be applicable.

• The applicant will ensure that prior to construction drawings and/or computations subject to approval will be submitted for approval and that the Surveyors of BRS will for performance of their construction supervision functions at any time be granted access to the structure as such and to all relevant workshops and premises of the shipyard.

• Unless otherwise agreed in writing, the fees will be calculated on the basis of actually realized construction data of the ship based on BRS's tariffs of fees in force on the date of delivery of the ship.

• Upon completion of construction the final certificates will be handed to the applicant only upon complete settlement of all fees claimed. The right of charging additional fees in the event of the construction periods being exceeded is reserved.

• Any rescission of the present application for classification requires to be stated in writing. In that case fees will be charged in accordance with the state of construction of the newbuilding and with the services rendered until the date of rescission.


DETAILS AS PER GENERAL ARRANGEMENT PLAN


SHIP TYPE
OTHER TYPES:


PROPULSION




MAIN DIMENSIONS
Lpp:m.
Length between perpendiculars
B:m.
Breadth
H:m.
Depth
BRZ:m.
Gross tonnage
T:m.
Draught
T AT TIMBER LOAD LINE:m.
BRT:m.
Gross registered tons
DEADWEIGHT:t. DISPLACEMENT (SUMMER LOAD LINE):t



GENERAL
SPEED:kn.
IN ACCORDANCE WITH CONSTRUCTION RULES, CHAPTER 1, SECTION 1, H.5
TRADE ROUTE:

ENVISAGED FLAG/PORT OF REGISTRY (OR COUNTRY):
MAKER: TYPE:


ADDITIONAL DATA FOR DRY CARGO SHIP:

NUMBER OF HATCHES:
MAXIMUM LENGTH OF HATCHES:m. MAXIMUM WIDTH OF HATCHES:m.
HEIGHT:m.
NUMBER OF CONTAINERS: 20': 40':

ADDITIONAL DATA FOR TANKER:

SEAGOING SHIP FLASHPOINT   >60°   <60°
  
INLAND VESSEL CATEGORY K03 K0n K13 K1n K2 K3
SHIP TYPE   I   II   IIA   III   IIIA   IV   V
 
GAS TANKER SHIP TYPE   1G   2G   2PG   3G
  
CHEM. TANKER TYPE   1   2   3
  
NUMBER OF TANKS:
NUMBER OF LONGITUDINAL BULKHEADS:

ADDITIONAL DATA FOR PASSENGER SHIP/FERRY:

NUMBER OF PASSENGERS: NUMBER OF CARS: NUMBER OF TRUCKS:





DETAILS OF MACHINERY

MAIN PROPULSION:

ENGINE TYPE: NUMBER OF MAIN ENGINES
MAKER/PLACE OF CONSTRUCTION:
TOTAL RATED POWER: kW SPEED: min-1
  
NUMBER OF MAIN ENGINES: TOTAL RATED POWER kW
MAKER/PLACE OF CONSTRUCTION:
  
NUMBER OF MAIN BOILERS:
MAKER/PLACE OF CONSTRUCTION:
STEAM CAPACITY EACH BOILER: th HEATING SURFACE: m2
MAXIMUM ALLOWABLE WORKING PRESSURE: bar
   
NUMBER OF MAIN ENGINES: TOTAL RATED POWER kW
MAKER/PLACE OF CONSTRUCTION:
  
REDUCTION RATIO:
NUMBER OF PROPELLER SHAFTS: PROPELLER SPEED: min-1


AUXILIARIES:

NUMBER: MAKER/PLACE OF CONSTRUCTION:
RATED POWER: kW SPEED: min-1
NUMBER: MAKER/PLACE OF CONSTRUCTION:
RATED POWER kW SPEED: min-1
    
NUMBER: MAKER/PLACE OF CONSTRUCTION:
RATED POWER: kW
NUMBER: MAKER/PLACE OF CONSTRUCTION:
RATED POWER kW
  
NUMBER: MAKER/PLACE OF CONSTRUCTION:
RATED POWER: kW
NUMBER: MAKER/PLACE OF CONSTRUCTION:
RATED POWER kW
   


NUMBER: HEATING SURFACE: m2
MAXIMUM ALLOWABLE WORKING PRESSURE: bar
MAKER OF AUXILIARY BOILER: PLACE OF CONSTRUCTION:
   
NUMBER OF GENERATORS/ALTERNATORS: TOTAL RATED POWER: kVA/kW
   
RANGE FROM: Hz TO: Hz



CARGO REFRIGERATING INSTALLATION:

NUMBER OF REFRIGERATED HOLDS: TOTAL CAPACITY: m3
NUMBER OF REFRIGERATED CONTAINERS:
NUMBER OF PAIRS OF COUPLINGS FOR REFRIGERATED CONTAINERS:


AUTOMATIC INSTALLATION:



SPECIAL CONDITIONS:
Construction with participation by different shipyards - Particular service conditions not mentioned previously - Special arrangements regarding the obligation of payment of fees, unless taken over by the shipyard within the scope of the building contract - Or the like.



APPLICANT NAME:
E-mail:
Tel. No: